New build snagging survey
New build snagging survey
An independent snagging inspection of a new home: a referenced, photographed defect list your developer can act on, measured against warranty standards.
Last reviewed 31 August 2026
What is a snagging survey?
A snagging survey is an independent inspection of a newly built home that records defects, unfinished work and items falling short of the applicable warranty and building standards. The output is a referenced, photographed schedule the developer can work through. It is a quality inspection of finished work, not a structural assessment and not a valuation.
At a glance
- Timing
- Ideally before legal completion; otherwise within the initial warranty period.
- Output
- Room-by-room schedule with references, photographs and locations.
- Measured against
- Warranty provider standards and building regulations requirements.
- Not included
- Valuation, structural design opinion, or negotiation with the developer.
What counts as a snag
A snag is work that is incomplete, defective, or below the standard the warranty provider and building regulations require. It ranges from a poorly hung door to missing loft insulation, absent cavity trays or drainage that has not been finished correctly.
The useful distinction in a report is between cosmetic items, which developers fix quickly, and performance items, which cost them more and therefore need to be documented precisely.
- Internal finishes, doors, joinery, tiling and decoration
- Loft: insulation coverage, ventilation, and completed detailing
- External: brickwork, pointing, rainwater goods, drainage and ground levels
- Services visible without dismantling: sanitaryware, sockets, ventilation terminals
Timing decides your leverage
Before completion, the developer wants the transaction to close and defects tend to be resolved quickly. After completion you rely on the developer's own defects process and the warranty provider's dispute route, which is slower.
Some developers resist pre-completion access for third-party inspectors. If access is refused, an inspection immediately after completion — well within the first warranty period — still puts a documented schedule in front of them at the point when your rights are strongest.
How the report is written to be actioned
Site managers respond to schedules that are specific: room, location within the room, description, photograph, and the standard it fails. Vague lists get argued about.
The report is structured so items can be ticked off and re-inspected, and so an unresolved item can be escalated to the warranty provider with the original evidence intact.
Who this is for
A good fit if
- Buyers completing on a newly built house or apartment
- Owners still within the initial warranty period
- Anyone whose developer has closed a defects list they do not accept
Not the right choice if
- Structural design opinions or calculations
- Valuation or mortgage purposes
- Older properties, where a condition survey is the right instruction
Getting the timing right
Three steps that decide how much the inspection is worth.
1.Request pre-completion access
Ask early and in writing. Even a partial inspection before completion is worth more than a full one afterwards.
New build home survey2.Know your warranty period
The initial period, when the developer is directly responsible for defects, is short. Diary it.
New build surveys hub3.Keep the evidence
Photographs and dated schedules are what a warranty escalation runs on.
Surveying advice
When to bring in a specialist
- Electrical installations, gas, drainage and fire safety: instruct the relevant competent professional for testing and certification.
- Warranty disputes and legal remedies: your conveyancer and the warranty provider's resolution service.
- Movement requiring calculations, monitoring design or remedial design: instruct a structural engineer.
Common questions
Limitations and sources
- Any survey is limited to what the surveyor can see and safely reach on the day. Areas behind finishes, under floors or beneath stored belongings are not opened up.
- A snagging inspection does not open up completed work or test services.
- It is not a RICS Home Survey and does not report on condition in the same terms.
- Nothing on this page is a professional opinion about a specific property. KJ Surveyors has not inspected your building, and general guidance cannot replace an inspection and report.
Source: NHBC · checked August 2026
Source: UK Government · checked August 2026
Source: RICS · checked August 2026
Last reviewed 31 August 2026.
Where to go next
- the new build hub — the parent page for every new-home service.
- new build home surveys — condition reporting rather than snagging.
- survey costs — how snagging fees compare with survey fees.
Completing on a new home?
Tell KJ the developer, the build stage and your completion date. KJ will explain when to inspect and what the schedule should cover.
KJonline
Free surveying guidance across North West England
Hi, I'm KJ. Tell me about the property or the surveying advice you need and I'll help you work out the right next step.
KJ gives general guidance only and has not inspected your property. A professional opinion follows an inspection by a surveyor.